How to Install a Link Code 3 Builders Range Roller Blind
By Betta Blinds and Awnings - 5th December 2022
Note
This applies to our Builders Range Roller Blinds but our Standard Range Roller Blinds are installed in a similar way.
This applies to our Builders Range Roller Blinds but our Standard Range Roller Blinds are installed in a similar way.
What is a Link Code 3?
A Link Code 3 allows two Roller Blinds to be linked together to span longer covering applications. The Link Code 3 features chain drives on both sides of the window that allow the blinds to be raised and lowered independently of each other.

Retract the Female Pin
1. On the left hand blind rotate the clear plastic part to retract the female pin on the linking drive

Install the Left Blind
2. Install the blind by inserting the chain drive end into the bracket.
3. Carefully press the linking end of the blind into the corresponding bracket. It has a channel that should guide the linking end easily into place.
3. Carefully press the linking end of the blind into the corresponding bracket. It has a channel that should guide the linking end easily into place.

Retract the Male Pin
4. Now starting on the right blind retract the male linking end by twisting the clear plastic until you hear it click into the retracted position.

Install the Right Blind
5. Insert the chain drive end of the Blind into the corresponding bracket.
6. Finish installing the right blind by pushing the linking end into the bracket.
6. Finish installing the right blind by pushing the linking end into the bracket.

Test
9. Test the Blind to ensure it is operating correctly.

And You're Done!
Congratulations you have successfully installed a Link Code 3 Roller Blind.